MODERNISATION & DIVERSIFICATION SCHEME

1 ) Process Upgradation/Modernisation of Cashew processing units

1.             Steam Cooking Vessels

2.             Boiler

3.             Cutting Machines & accessories

4.             Peeling / Grading Platforms and accessories

5.             Kernel Pieces Sizing Machine

6.             Oil Expeller for CNSL extraction

7.             Diesel Engine (specify the use)

8.             Electric Motor (specify use)

9.             Oil Tank for CNSL

10.         Electric/Tunnel /Diesel, Thermal, Shell fired Borma (other  than traditional borma)

11.         Hot Air Generator & Accessories

12.         Steel Trays/Aluminium Trays / Bowls

13.         Kernel Roasting Machine with feeder

14.         Colour Sorting Machine

15.         Grading machines

16.         Electronic count balance

17.         Trolleys

18.         Generator

19.         Humidifier/Atomiser & Water purifier

20.         Hydraulic carts and Forklifts

21.         Pallets

22.         Moisture Meter

23.         Pump set & Motor

24.         Mesh for Insect and bird proofing

25.         Fire extinguisher

26.         Insect Catcher / Exterminator

27.         Conveyors

28.         Rawnut Sizing Machine

29.         Electronic weighing machine (maximum 2 nos.)

30.         Magnetic metal separator

31.         Foreign matter removal systems

32.         Cashew Kernel Washing System

33.         Dewatering system

34.         CNSL Heater

35.         CNSL/Chemical Pump

36.         Air Curtain

37.         Dicing Machine

38.         Pollution Control System/Equipments

39.         Automatic processing & packing systems like peeling machine, grading machine, cutting machine, filling & sealing machine, etc.

40.         Building and related civil works

41.         Non conventional Energy

42.         Whole Kernel Sizing Machines

43.         Kernel Sizing Machines

44.         Electricity Generators

45.         Weigh –bridges

46.         Raw cashew Hot oil bath including oil-heaters, pumps, oil-tanks, centrifuges and product-handling conveyors.

47.         Any other item as approved  by the Inspection Committee equipment

48.          

 

2) Setting up facilities for Value Addition / Consumer Packing of
  1. Cashew kernels roasting machinery
  2. Salting / coating / flavouring machinery
  3. Heating and cooling equipment for production processing
  4. Consumer packaging machines
  5. Printing machines for consumer packs
  6. Labeling machines
  7. Bar coding machines
  8. Hopper / Feeding systems
  9. Related Civil works.
  10. Continuous/batch frying machines
  11. Oil-heating systems
  12. Oil tanks and handling systems
  13. Oil filtration / cleaning systems
  14. Nitrogen-generators
  15. Weight-based filling systems (multi-head weighers)
  16. Volumetric filling machines (cup-fillers, auger-fillers)
  17. Pouch-forming machines
  18. Nitrogen/CO2 flushing systems including Nitrogen-tunnels, liquid- 
    Nitrogen dosing systems
  19. Vacuuming systems
  20. Sealing systems including pouch-sealers, can/canister seamers, jar 
    and tray-sealers (Induction/hot-plate),
  21. Other relevant items and automated systems related to     
     manufacture, processing, sorting, packing, quality control /  
     assurance, screening, etc.
  22. Non conventional energy equipment
  23. Any other item as approved by the Inspection Committee
3) Adoption of new packaging system

1)                  Flexible Packaging Machine & Accessories

2)                  Filling System & Accessories

3)                  Air Compressor

4)                  Mould & Former

5)                  Conveyor

6)                  Vibratory Table with Vibratory Motor

7)                  Vibro Screen/Vibratory Sieve

8)                  Voltage Stabiliser

9)                  Dust Remover

10)              Filling Table Vibratory Type

11)              Stainless Steel Mesh

12)              Electronic Weighing Machine

13)              Platform Roller

14)              Kernel Aspirator with blower, etc

15)              Sieving machine

16)              Carbon Di-Oxide and Nitrogen regulator with heater and control panel

17)              Electronic Count Balances

18)              Vacuum pump

19)              Carton Strapping Machine and carton sealing machine

20)              Bar coding Machines

21)              Metal detector

22)              Gas Mixer

23)              Moisture Meter

24)              Vacuum Cleaner

25)              X-ray Inspection System

26)              Grading machines

27)              Foreign matter removal Systems

28)              Automatic packing systems grading machine, filling & sealing machine, etc.

29)              Building and related civilworks

30)              Nitrogen-generators

31)              Weight-based filling systems (multi-head weighers)

32)              Volumetric filling machines (cup-fillers, auger-fillers)

33)              Pouch-forming machines

34)              Nitrogen/CO2 flushing systems including Nitrogen -tunnels, liquid-Nitrogen dosing systems

35)              Vacuuming systems

36)              Sealing systems including pouch- sealers, can/canister seamers, jar and tray-sealers, (Induction/hot-plate),

37)              Non conventional energy equipment

38)              Any other item as approved by the Inspection Committee

4) Implementation of internationally accepted Quality

1.                  ISO / HACCP/ Organic Consultancy charges

2.                  Certification charges

3.                  Certification Audit charges

4.                  Training charges

5.                  Safety equipments

6.                  Caliberation of Equipments

7.                  Printing of manuals, Training Materials, etc.

8.                  Air Curtain

9.                  Insect Proofing

10.              Vacuum Cleaner

11.              Air Purifier

12.              Water purifying system

13.              Atomiser and Hygrometer

14.              Infrared Moisture Balance

15.              Electronic Count Balance

16.              Electronic weighing machine

17.              Foreign matter removal systems

18.              Mixer/Grinder

19.              Air Circulation and lighting

20.              Laboratory equipments

21.              Water cleaning system

22.              Pest Control system/equipments

23.              Fire extinguisher

24.              Item/work related/necessary for Organic Certification

25.              Building and related civil works

26.              Non conventional energy equipment

27.              Any other item as approved by the Inspection Committee

 

APPLICATION

The individual cashew processors-exporter who desires to avail of the financial assistance has to submit the application in the prescribed form (Annexure1) . On receipt of the application, the Council, after preliminary scrutiny shall place the same before the Committee of Administration of the Council. Proposals involving civil works, Buildings, etc, should be accompanied by an essentiality certificate (Annexure - I-a) from a Chartered Engineer with drawings & estimate of expenditure, duly certified by the Chartered Engineer.

 The Committee shall examine the proposal, and if found acceptable, approve it.  The Committee may recommend modification in the scheme if found necessary.  The Council will communicate the approval of the Committee to the applicant. The expenses incurred after issue of Council’s approval will only qualify for grant-in-aid.

Release of Grant-in-aid

On completion of the project, the applicant is required to submit to the Council the claim in the prescribed format (Annexure II) after which, an inspection of the unit will be arranged with the approval of the Dpt. Of Commerce, Govt. of India. The date of inspection will be intimated to the applicant who shall render necessary assistance to the inspection team to carry out the inspection / verification. All the equipments and machineries should be in working condition at the time of inspection.  The inspection team will submit a detailed report after physical verification and examination of the implementation / functioning of the project.  On the basis of the inspection report the Selection Committee will consider the release of eligible grant-in-aid to the beneficiary. 

The beneficiary has to fulfill an export obligation to effect cashew / cashew product export of five times of the grant amount provided to the beneficiary after which only the grant will be released .  The time allowed for fulfilling the export obligation is one year from the date of completion of the project.  The release of grant before fulfillment of export obligation will be considered subject to production of a Bank Guarantee for an equivalent amount until the exporter fulfills the export obligation.  If the export obligation is not achieved, the entire grant has to be refunded to the Council with interest at commercial lending rates of nationalised banks from the date of disbursement of grant.

Instructions / Guidelines

1.     The claim form (Annexure – II) shall be submitted to the Cashew Export Promotion Council of India along with the following supporting documents/details

 

a.            Statement of expenditure in the claim form to be signed by the applicant as well as the Chartered Accountant.

b.            In case of civil works/building construction, the statement of expenditure should be signed by the Chartered Engineer who has given the essentiality certificate, building plan etc. as well as a Chartered Accountant.

c.            Legible photocopies of Bills and Receipts certified by the Chartered Accountant. Bills should clearly show the value specifically for each eligible item.

d.            Certificate of completion duly signed by the applicant.(Annexure II-a)

e.            Self attested photocopies of ISO / HACCP/Organic certificate wherever applicable

f.             Certificate by the applicant to the effect that no subsidy has been claimed or will be claimed for these expenditures from Government funds through any other Governmental bodies. (Annexure II-b).

g.            Beneficiary exporter will be required to remit 2% of the approved grant amount (to meet scheme implementation costs)  and Rs. 3000/-per factory towards the inspection charges for the civil works before release of grant amount.

 

2.    The claim, complete in all respects should be received in the office of the CEPCI within one month from the date of completion of the project.

 

3.                  Any other details/clarifications on the project that are considered necessary for allowing grant-in-aid shall be furnished by the applicant, as & when called for by the Council.

 

4.                  If considered necessary, the applicant may be required to be present before the Committee of Administration and the Selection Committee for clarifications, if any, with respect to the project for which the grant-in-aid is applied for.

 

5.                  The grant amount will be released only after the completion of the project   and approval of the Selection Committee, subject to norms and availability of funds from the Govt. of India.

 

In case of any dispute, the decision of the Selection Committee shall be final.